Friday, June 11, 2010

Penn House Cherry 5/0 Poster Bed

The finish repair is complete.
I found a fracture in the pin block section of one headboard post. So I had to go back to the bench fot a repair.

The bed before finishing repairs begin to the existing finish.


Post are held in place with rope clamps.



Footboard assembled and clamped.




The mortise and tennon joint; bored, glued, and clamped.





Pieces of cherry have been added to a headboard spool.






Footboard parts.







Footboard with one broken post and a broken robe rail.


















Split outs and missing pieces.






















Both post have been broken at of the spool tennon joint.












No comments:

Post a Comment